Advanta Services, electrical and climate
Open three-phase Hager board with L1, L2 and L3

Electrical

Three-phase installations

Three-phase boards and supplies for workshops, farms and commercial buildings, where the incoming supply allows it.

What we cover

Three-phase work

Boards and supplies for workshops, farms and commercial buildings, and larger domestic supplies. Only where three-phase is already available, or can be.

Schneider three-phase distribution board in a commercial building

01

What we install

The board, the supplies for machinery, and feeds out to other buildings.

  • Three-phase consumer units
  • Machinery and workshop supplies
  • Distribution to outbuildings

02

What has to be true first

Not every property has a three-phase incoming supply. That is checked before a board is priced.

  • The incoming supply confirmed
  • The load agreed before the board is specified
  • Certification included in the price

How it works

From the incoming supply to a three-phase board

Three-phase work starts with what is already coming into the building. Where the supply allows it, we fit the board and the circuits for workshops, farms and larger commercial loads, then test and certify the new work.

Open three-phase Hager board with L1, L2 and L3
Schneider three-phase distribution board in a commercial building
  1. Step 1

    Tell us the load

    What you need to run, the type of building, and a photo of the existing board. Not every property has a three-phase incoming supply, and we check that before pricing a board that cannot be connected.

  2. Step 2

    Agree the distribution

    A three-phase consumer unit, supplies for machinery, or a feed out to another building. The price is fixed once the supply and the load are known, and it includes certification.

  3. Step 3

    Install and certify

    The board and circuits are fitted, labelled and tested. You get the certificate for the new work, and a clear note of what each way is feeding.

Next step

Three-phase priced from the incoming supply

Tell us the building and what you need to run, and send a photo of the existing board. We check the incoming supply before the price is fixed.

Monday to Friday, 08:00 to 17:00. Emergency call-outs out of hours · chris@advantaservices.co.uk

Advanta Services Ford Transit Custom

Local

Where we work

Based around Spalding and Peterborough. We cover Lincolnshire, Cambridgeshire, Norfolk, Suffolk, Essex, Hertfordshire, Northamptonshire and Rutland. Call us with the town and the job.

Spalding & Pinchbeck

Spalding, Pinchbeck, Bourne, Crowland, Holbeach, Long Sutton, Market Deeping, Gosberton, Sutton Bridge

Peterborough

Peterborough, Hampton, Werrington, Orton, Eye, Whittlesey, Market Deeping

Wisbech

Wisbech, March, Long Sutton, Sutton Bridge, Whittlesey

Boston

Boston, Kirton, Sutterton, Heckington, Sleaford

Stamford

Stamford, Bourne, The Deepings, Market Deeping, Ketton, Ryhall

Lincolnshire

Spalding, Pinchbeck, Boston, Bourne, Stamford, Holbeach, Sleaford, Long Sutton, Crowland, Kirton, Gosberton, Market Deeping, Sutterton, Heckington, Sutton Bridge

Cambridgeshire

Peterborough, Wisbech, March, Whittlesey, Ely, Huntingdon, St Neots, St Ives, Hampton, Werrington, Orton, Eye, Market Deeping

Norfolk

King's Lynn, Downham Market, Hunstanton, Swaffham, Fakenham, Dersingham, Heacham, Terrington

Suffolk

Bury St Edmunds, Newmarket, Mildenhall, Haverhill, Sudbury, Stowmarket, Brandon, Lakenheath

Essex

Saffron Walden, Braintree, Chelmsford, Colchester, Halstead, Great Dunmow, Stansted, Witham

Hertfordshire

Bishop's Stortford, Royston, Hitchin, Stevenage, Ware, Baldock, Buntingford, Letchworth

Northamptonshire

Northampton, Kettering, Corby, Wellingborough, Oundle, Thrapston, Rushden, Raunds

Rutland

Oakham, Uppingham, Cottesmore, Empingham, Ketton, Langham, Whissendine, Ryhall

FAQ

Frequently asked questions

Not always. It depends on the supply coming into the building. We check that before we price a board that cannot be connected.

Yes. Farms and workshops are normal three-phase work, including supplies for machinery and feeds out to other buildings on the site.

Yes. What we install is tested and certified. The board is labelled, so you can see what each new way is feeding once we have finished.

A list of what the building must run, and a photo of the board. Machinery, welders or a feed to another building are what we size the supply around.

Only where the house already has a three-phase supply, or one can be provided. We tell you which it is before any board is priced.